Lower Haeckerville Road
City of Cibolo, Cibolo, Texas
This project included the reconstruction of approximately 2.5 miles of roadway, improving the existing pavement conditions. The reconstruction involved milling and overlaying the existing pavement and adding 4-5 feet of pavement on both sides, widening the pavement section to two 12-foot lanes with a 2-foot shoulder. Roadside ditch grading was included in areas prone to ponding to ensure positive flow to Cibolo Creek.
The GarzaEMC team provided comprehensive engineering services, including plans, specifications and estimate services as well as design, SWPPP, grading, drainage, and utility coordination.
Cost
$2.2M
Completion
2018
Size
2.5 Miles