The Somerset Pumping Station project included the construction of a new 1.5-million-gallon ground storage tank (GST), a pressure reducing valve station, an on-site tank overflow drainage system, a new chlorine disinfection building and upgrades, SCADA improvements, electrical upgrades, site security enhancements, a public water dispenser, and yard piping. Site and facility improvements also involved the demolition of a 300,000-gallon GST and a metal building, along with site drainage, grading, and lighting. The project was carefully phased to ensure the site remained operational throughout construction.
Size
1.5 MG